Skip To Main Content

Brimscombe & Thrupp Parish Council

Track Repair - The Cleeves, Brimscombe

A section of the track will be re-surfaced (the area of the junction with the track leading down to GK Joinery) and bollards will be installed at either end of the remaining section to prevent vehicular access. These will be removable bollards so that access can be gained upon request to maintain services.

It is currently proposed to install the kerbs and bollards in the early part of week commencing 27th July. The tarmac will be laid on 31st July, giving time for the kerbs to set.

Obviously, access will be restricted during these works and the residents have been notified. We have also asked them not to drive over the kerbs for a period of 24 hours.

Asbestos reassurance monitoring will be undertaken during all works, together with dust suppression where and when required. A welfare unit for the workers will be installed for the duration of the works. This will be located at GK Joinery, between the building and the lorry that is parked there.

Posted: Tue, 21 Jul 2020 11:38 by Admin

Tags: News, Travel